Signage coordination on commercial projects

By Scavi Company · · 3 min read
Signage coordination on commercial projects

Exterior signs, wayfinding and ADA signs are often the last items installed and the first ones the public sees. Coordinate them early.

Types of signs

Exterior building signs, monument signs, wayfinding, room signs and ADA signs.

Permits

Exterior signs usually need their own permit. Lead times can be long.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Blocking

Heavy signs need blocking inside walls before they close.

Power

Illuminated signs need power and controls at the right place.

ADA signs

Required signs with tactile text and braille, at the right height and location.

Owner vendors

Brand signs are often bought by the owner. Define who installs and when.

Lead times

Custom signs can take weeks. Order early.

Installation timing

After facade finishes and before opening, without damaging new surfaces.

Getting started

List every sign in the drawings at the start of the project, mark who supplies it and add blocking and power to the rough-in checklist.

Common mistakes

No blocking, missing power for lit signs and forgetting the sign permit.

Example

A retail project almost opened without its main sign because the sign permit was filed late. On the next job, the contractor listed every sign at the start, filed the permit early and added blocking and power to the rough-in checklist.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Are ADA signs required on commercial projects?

Yes. Commercial buildings must have accessible signs where required, such as room identification and restrooms, with tactile characters and braille at the correct height and location.