Curtain wall and storefront coordination

By Scavi Company · · 3 min read
Curtain wall and storefront coordination

Glazing systems need early coordination and careful water management.

Design-assist

Involve the glazier early.

Shop drawings

Review details carefully.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Mockups

Test water performance.

Anchors

Embedded and structural attachments.

Waterproofing

Interfaces with other trades.

Lead times

Glass and frames take time.

Installation

Sequence and protection.

Where to start

Hold a coordination meeting between the glazier, waterproofing sub and structure team before shop drawings.

An example

A GC built a mockup and ran a water test before production. The test found a sealant issue that was fixed before installation.

What to track

Track shop drawing approvals, mockup results, deliveries and water test outcomes.

Questions to ask

Who owns the envelope interfaces? When must embeds be placed? Is a field water test required?

Common mistakes

Late shop drawing reviews, unclear responsibility for envelope transitions and skipping mockups to save time, which often costs more time later.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What is the difference between curtain wall and storefront?

Storefront systems are generally used at ground level and lower heights, while curtain walls span multiple floors and are hung from the building structure.