Glazing systems need early coordination and careful water management.
In this article
Design-assist
Involve the glazier early.
Shop drawings
Review details carefully.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Mockups
Test water performance.
Anchors
Embedded and structural attachments.
Waterproofing
Interfaces with other trades.
Lead times
Glass and frames take time.
Installation
Sequence and protection.
Where to start
Hold a coordination meeting between the glazier, waterproofing sub and structure team before shop drawings.
An example
A GC built a mockup and ran a water test before production. The test found a sealant issue that was fixed before installation.
What to track
Track shop drawing approvals, mockup results, deliveries and water test outcomes.
Questions to ask
Who owns the envelope interfaces? When must embeds be placed? Is a field water test required?
Common mistakes
Late shop drawing reviews, unclear responsibility for envelope transitions and skipping mockups to save time, which often costs more time later.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
What is the difference between curtain wall and storefront?
Storefront systems are generally used at ground level and lower heights, while curtain walls span multiple floors and are hung from the building structure.