Low-voltage subcontractor coordination

By Scavi Company · · 3 min read
Low-voltage subcontractor coordination

Data, cameras, access control and AV systems often involve several vendors. Coordinating them before walls and ceilings close saves rework.

What low-voltage includes

Data and phone cabling, Wi-Fi, security cameras, access control, intercoms, audio-visual and interfaces with fire alarm.

Many vendors

The owner often hires some of these vendors directly. Define who does what in writing.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Rough-in timing

Boxes, conduits and pathways must be in before drywall.

Above ceilings

Cable trays and supports need space in crowded ceilings. Coordinate with mechanical and electrical.

Door hardware

Access control needs power and cabling at doors. Coordinate with the door hardware supplier.

Power

Low-voltage equipment needs outlets and dedicated circuits in closets and racks.

Telecom rooms

Size, cooling and power for network rooms.

Testing

Test and label cables before turnover.

Getting started

Ask the owner for a list of every low-voltage system and vendor at the start of the project and add their rough-in dates to the schedule.

Common mistakes

Closing walls before rough-in, unclear owner vendor scope and no power at the rack.

Example

On a school renovation, the owner's security vendor arrived after drywall. Walls had to be opened for cameras and access control. On the next project, the contractor listed every owner vendor at kickoff and set their rough-in dates before drywall.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

When should low-voltage rough-in happen?

Before drywall and ceilings close, at the same stage as electrical rough-in, so boxes, conduits and pathways are installed and inspected in time.