Quality

Above-ceiling inspections

By Scavi Company · · 3 min read
Above-ceiling inspections

Above-ceiling walks catch the problems that become costly later.

Trades

All complete.

Firestopping

Penetrations sealed.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Supports

Hangers.

Labels

Valves and junction boxes.

Access

Equipment reachable.

A closer look

Owners and inspectors often require above-ceiling walks. Photos of each area before tiles go in become valuable records for future maintenance.

Where to start

Schedule above-ceiling walks by area and photograph everything.

An example

A GC photographed every ceiling area before close-in. Months later, the photos helped locate a leaking valve quickly.

Common mistakes

Closing ceilings too early, missing labels and no photos.

What to track

Track areas approved and issues found.

Questions to ask

Who signs off? Are photos stored? Is equipment accessible?

Who owns it

The superintendent leads the walk, with each trade present to sign off its work. The owner's representative and inspector should know the schedule in advance so ceilings are not delayed.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What is checked in an above-ceiling inspection?

Supports, firestopping, labeling, insulation, access to valves and equipment, clearances and completion of all trade work.