Cuts, crushes and punctures are some of the most frequent jobsite injuries. Gloves prevent many of them, but only when they match the task and fit the hand.
In this article
Know the hazards
Sharp edges, pinch points, rough materials, chemicals and cold.
Cut levels
Cut-resistant gloves come in rated levels. Match the level to sheet metal, glass or blades.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Impact gloves
Padding on the back of the hand helps when handling heavy materials and tools.
Chemical gloves
Concrete, adhesives and solvents need chemical-resistant gloves, not work gloves.
Fit
Gloves that are too big get caught; too small and workers take them off. Stock several sizes.
Cold weather
Insulated gloves keep dexterity in winter so workers do not remove them.
Replacement
Worn gloves lose protection. Make it easy to get new ones.
Common mistakes
One glove for every task, no sizes and gloves near rotating parts.
Match gloves to tasks
Post a simple chart: task, hazard and recommended glove. Workers choose correctly when the answer is visible.
Listen to the crew
Ask which gloves they actually like. Comfortable gloves stay on hands.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
Should workers wear gloves near rotating tools?
Gloves can be caught by rotating parts like drill presses or lathes. Follow the tool manufacturer's guidance and your safety program for each tool.