Safety

Eye protection on the jobsite

By Scavi Company · · 3 min read
Eye protection on the jobsite

Grinding, cutting, chipping and overhead work send particles flying. Eye protection is cheap, but only works if it fits the task and the crew actually wears it.

Hazards

Flying particles, dust, chemical splashes and bright light from welding.

Safety glasses

Safety-rated glasses with side protection are the minimum for most tasks.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Goggles

For dust and splashes, goggles seal better than glasses.

Face shields

Grinding and cutting call for a face shield over safety glasses, not instead of them.

Prescription eyewear

Offer prescription safety glasses or over-the-glasses models. Workers with glasses often skip protection.

Fogging and comfort

Anti-fog lenses and comfortable fit keep glasses on faces.

Enforcement

Supervisors set the example. One exception becomes the rule.

Common mistakes

Scratched lenses, glasses on the hard hat and face shields used without glasses.

Stock enough pairs

Keep spares at the gate and in each gang box. Workers skip protection when they cannot find it.

Talk about near misses

A scratched lens or a chip that hit the glasses is a near miss worth sharing in the toolbox talk.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Are regular glasses enough on the jobsite?

Regular prescription glasses are not safety eyewear. Workers need safety-rated glasses, prescription safety glasses or protection designed to be worn over their glasses.