Coordination

Fire sprinkler coordination

By Scavi Company · · 3 min read
Fire sprinkler coordination

Sprinkler piping competes with ducts, lights and structure for space.

Shop drawings

Review early.

Clash detection

With other trades.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Head locations

Ceiling layout.

Inspections

Testing schedule.

Changes

Coordinate updates.

Common mistakes

Late coordination, clashes and failed inspections.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

When should sprinkler coordination start?

Early in design and during shop drawing review to avoid clashes.