Commercial solar coordination

By Scavi Company · · 3 min read
Commercial solar coordination

Solar projects need early coordination with roofing and electrical.

Loads

Structure.

Penetrations

Roofer.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Conduits

Routes.

Interconnection

Utility.

Warranty

Roof.

A closer look

Solar added late can void roof warranties or require structural changes. Coordinating early keeps both systems working.

Where to start

Include solar in roof and structural reviews from the start.

An example

A GC coordinated solar mounts with the roofer. The roof warranty stayed intact.

Common mistakes

Late solar decisions, unflashed penetrations and utility delays.

What to track

Track approvals and penetrations.

Questions to ask

Is structure checked? Who flashes? When will the utility approve?

Who owns it

PM coordinates solar contractor, roofer and utility.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What should GCs coordinate on commercial solar projects?

Structural loads, roof penetrations and warranty, conduit routes, electrical equipment space and utility interconnection approvals.