Roofing coordination on commercial projects

By Scavi Company · · 3 min read
Roofing coordination on commercial projects

Roofing is often damaged by other trades after it is installed.

Sequencing

Equipment before final roofing when possible.

Penetrations

Planned and flashed by the roofer.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Warranty

Manufacturer requirements.

Protection

Walkways and boards.

Inspections

Before closeout.

A closer look

Mechanical and electrical trades often cut penetrations after the roofer leaves. Without the roofer's involvement, leaks and warranty problems follow. Coordinating penetrations and protection keeps the roof warranted.

Where to start

Hold a roof coordination meeting with roofing, mechanical and electrical before roofing starts.

An example

A GC required all penetrations to be flashed by the roofer. The roof passed the manufacturer inspection without issues.

Common mistakes

Unplanned penetrations, no protection and missing warranty inspections.

What to track

Track penetrations, leak reports and warranty inspection results.

Questions to ask

Which trades need roof access and when? Who flashes penetrations? What does the manufacturer require for the warranty? How will the roof be protected during rooftop work?

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Why is roofing coordination important?

Because rooftop equipment, penetrations and foot traffic can damage the roof and affect the manufacturer's warranty if not planned.