Conference rooms and venues need power, data and backing for AV equipment.
In this article
Early design
AV needs.
Rough-in
Power and data.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Backing
For displays.
Conduit
Pathways.
Testing
Before turnover.
Common mistakes
Missing backing, late changes and no testing.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
When should AV systems be coordinated?
During design and rough-in, so power, data and backing are installed before walls close.