Quality

Radon-resistant new construction

By Scavi Company · · 3 min read
Radon-resistant new construction

Adding radon-resistant features during construction costs far less than mitigation later. Here is how builders do it.

Why it matters

Radon is a radioactive gas from soil that can build up indoors.

Gas-permeable layer

A layer of aggregate under the slab lets gas move to the vent.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Sealing

Seal slab cracks, joints and penetrations.

Vent pipe

A pipe from under the slab through the roof creates a passive system.

Future fan

Leave an electrical outlet in the attic so a fan can be added if needed.

Testing after occupancy

Recommend a radon test once the home is occupied.

Local requirements

Check whether your area requires these features by code.

Getting started

Add radon-resistant details to your standard plans in higher radon zones.

Common mistakes

No sealing, vent pipe without a clear path and no outlet for a future fan.

Example

A home builder in a higher radon county made radon-resistant features standard. Buyers appreciated it, and the builder avoided mitigation callbacks after closing.

Plan details to standardize

Aggregate layer under the slab, sealed joints and penetrations, labeled vent pipe and attic outlet. Standard details prevent field improvising.

What to track

Homes built with the system and post-occupancy test results shared by buyers.

Talking with buyers

Explain the system at the walkthrough and recommend a test after move-in. Buyers value knowing it is already built in.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Do new homes need radon-resistant construction?

It depends on the location. Some jurisdictions require radon-resistant features in new construction, especially in higher radon zones. Even where not required, it is an inexpensive addition.