Stormwater rules require contractors to keep sediment on site.
In this article
Plans
Follow the approved plan.
Silt fences
Installed correctly.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Inlet protection
Storm drains.
Entrances
Stabilized.
Inspections
Regular and after rain.
A closer look
Erosion controls are often installed at the start and forgotten. After a storm, fences are down and inlets clogged. Regular inspections, especially after rain, and quick repairs keep sites compliant and neighbors happy.
Where to start
Assign someone to inspect controls weekly and after every significant rain.
An example
A superintendent repaired silt fences right after a storm. The inspector found the site compliant during a surprise visit.
Common mistakes
Poor installation, no inspections and mud on public roads.
What to track
Track inspections, repairs and violations.
Questions to ask
Who inspects controls and how often? What happens after a heavy rain? Is the construction entrance keeping mud off the road? Are inspection records up to date?
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
What are common erosion control measures?
Silt fences, inlet protection, stabilized construction entrances, sediment basins, mulching and seeding of exposed soil.