A quick inspection before each shift catches leaks, damaged parts and safety devices that do not work.
In this article
Use a checklist
Manufacturer-based and short.
Every shift
Before operating.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Tag out problems
Unsafe equipment stays parked.
Record it
Keep inspection records.
Rental equipment too
Inspect what arrives on site.
Common mistakes
Pencil-whipped checklists, ignoring leaks and operating tagged equipment.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
What should a pre-use inspection include?
Fluids, tires or tracks, lights, alarms, brakes, controls and safety devices, following the manufacturer's checklist.