Safety

Pre-use equipment inspections

By Scavi Company · · 3 min read
Pre-use equipment inspections

A quick inspection before each shift catches leaks, damaged parts and safety devices that do not work.

Use a checklist

Manufacturer-based and short.

Every shift

Before operating.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Tag out problems

Unsafe equipment stays parked.

Record it

Keep inspection records.

Rental equipment too

Inspect what arrives on site.

Common mistakes

Pencil-whipped checklists, ignoring leaks and operating tagged equipment.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What should a pre-use inspection include?

Fluids, tires or tracks, lights, alarms, brakes, controls and safety devices, following the manufacturer's checklist.