Methods

Post-tensioned slabs basics

By Scavi Company · · 3 min read
Post-tensioned slabs basics

PT slabs are efficient but demand careful coordination.

Tendons

Steel cables under tension.

Stressing

Specialized crew.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Coordination

Sleeves and penetrations.

Safety

Stressing zones.

Later work

Scanning before drilling.

A closer look

PT slabs are common in parking garages and multifamily buildings. The biggest risk comes later, when trades drill for anchors or penetrations. Clear marking, scanning and rules prevent tendon damage.

Where to start

Plan all sleeves and penetrations before the pour and mark tendon zones.

An example

A GC banned drilling without scanning on a PT slab. No tendons were damaged during interior work.

Common mistakes

Uncoordinated penetrations, drilling without scanning and unsafe stressing zones.

What to track

Track penetrations planned and drilling permits.

Questions to ask

Are penetrations planned? Who scans? Do trades know the rules?

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Can you drill into a post-tensioned slab?

Only with great care, after scanning or locating tendons and following engineer requirements. Cutting a tendon can be dangerous and costly.