Concrete pour planning

By Scavi Company · · 3 min read
Concrete pour planning

A well-planned pour finishes on time with a slab that meets spec.

Mix design

Approved and correct for the element.

Ordering

Volume, timing and spacing of trucks.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Pump and access

Where trucks and pump will set up.

Crew

Enough people for placing and finishing.

Weather

Hot, cold or rain plans.

Inspections

Rebar and embeds signed off.

Curing

Materials ready.

A closer look

Large pours fail at the edges of the plan: a truck delayed in traffic, a pump that cannot reach the far corner, a missing finisher. Hold a short pre-pour meeting the day before with the concrete supplier, pump operator, finishing foreman and testing agency. Walk the route trucks will take, confirm washout location and agree who calls the plant if spacing needs to change.

Where to start

Create a one-page pour checklist and require it to be signed before every structural pour.

Common mistakes

Ordering short, no backup pump plan, ignoring the forecast and skipping curing.

An example

A GC held a pre-pour meeting before a large elevated slab and discovered the pump could not reach one corner from the planned setup. Moving the pump location the day before saved the pour.

What to track

Track planned vs actual pour times, cylinder test results, truck spacing issues and finishing defects.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What should be on a concrete pour checklist?

Approved mix design, inspections passed, order confirmed, pump and truck access, crew and tools, weather plan, testing agency, finishing and curing materials.