Markets

Parking garage construction

By Scavi Company · · 3 min read
Parking garage construction

Durability decisions matter for decades.

Systems

Precast or PT.

Drainage

Slopes.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Durability

Sealers.

Lighting

Safety.

Traffic

Ramps.

A closer look

Water and deicing salts attack concrete and reinforcement. Drainage slopes, sealers and quality concrete placement protect the owner's investment.

Where to start

Review drainage and durability details in preconstruction.

An example

A GC corrected slopes before pouring. The garage drained well and avoided ponding.

Common mistakes

Poor slopes, skipped sealers and late lighting.

What to track

Track pours and sealer application.

Questions to ask

What system? Are slopes correct? What durability measures?

Who owns it

The superintendent manages pours; PM coordinates with engineer.

Pricing and risk

Durability details like sealers, drainage and concrete cover affect long-term performance and warranty risk. Price them fully and document compliance.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What are common structural systems for parking garages?

Precast concrete and cast-in-place post-tensioned concrete are common. Each has advantages for speed, cost and durability.