Safety

Manual material handling and lifting

By Scavi Company · · 3 min read
Manual material handling and lifting

Back and shoulder injuries from lifting are among the most common in construction. Planning the lift prevents most of them.

Use equipment

Carts, dollies and hoists first.

Team lifts

Two people for heavy or awkward items.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Good technique

Load close, no twisting.

Plan deliveries

Drop materials close to where they are used.

Stretch and warm up

Before heavy work.

Common mistakes

Carrying alone, long carries and ignoring early pain.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

How can crews reduce lifting injuries?

Use carts and lifting equipment, lift with a partner for heavy or awkward loads, keep loads close and avoid twisting.