Receiving and inspecting material deliveries: the cheapest quality control on the job

By Scavi Company · · 3 min read
Receiving and inspecting material deliveries: the cheapest quality control on the job

Material problems are cheapest when caught at the tailgate. A named receiver and a one-page checklist turn fifteen minutes into days of schedule protection.

Why receiving matters

A wrong or damaged delivery discovered at installation stops a crew, pushes the schedule and starts a fight about who pays. Discovered at the truck, it is a phone call. Fifteen minutes of receiving is the cheapest quality control on the job.

Assign a receiver

Every delivery needs a named person with the purchase order in hand. A delivery signed by whoever was closest is a delivery nobody checked. Put expected deliveries on the look-ahead so the superintendent knows who is receiving what.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Check against the PO, not the ticket

The delivery ticket shows what the supplier sent; the purchase order and approved submittal show what you need. Check quantity, size, model, finish, color and lot. The wrong door hardware finish looks fine in the box.

Open and look

  • Crushed or wet packaging hiding damage.
  • Warped or wet lumber.
  • Cracked glass and fixtures.
  • Mismatched lots in tile, carpet and paint.

Note exceptions before signing

Write shortages and damage on the delivery ticket before signing, and photograph them. A clean signature makes claims much harder, and freight carriers often have short windows for damage claims.

Plan the staging

Decide in advance where each delivery lands: out of weather, out of traffic paths and secured from theft. Material dropped at the curb overnight can disappear, and material staged in the wrong place gets moved twice.

When the supplier got it wrong

Call the same day, send the photos and get a replacement date in writing. If the item blocks the critical path, ask what equivalent product can be picked up today and route the submittal question to the architect immediately. Resequence the crew while you wait so labor is not standing idle.

Owner-furnished items

When the owner supplies equipment or finishes, inspect on arrival and report problems in writing the same day. If you do not, the damage starts to look like yours.

Keep the paper

File delivery tickets with the PO. At closeout and in job costing, that file shows what was bought, returned and billed, and it settles backcharge disputes with suppliers.

Where to start

Create a one-page receiving checklist, post it in the trailer and require a photo of every signed ticket in the daily report.

Field discipline protects the margin.

We help builders and specialty contractors win better work and run it profitably.

Frequently asked questions

What should be checked when materials are delivered to a jobsite?

Item by item against the purchase order and approved submittal: quantity, size, model, finish, color and lot. Open damaged packaging, write shortages and damage on the delivery ticket before signing and photograph them.