Renovating older homes and child-occupied facilities can disturb lead paint. The EPA rule tells contractors how to do it safely and legally.
In this article
What the rule covers
The EPA Renovation, Repair and Painting rule applies to work that disturbs painted surfaces in homes and child-occupied facilities built before 1978.
Firm certification
The company must be certified by the EPA or an authorized state program.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Certified renovator
At least one certified renovator must direct the work and train the crew in lead-safe practices.
Before the work
Give the owner or occupants the required lead information pamphlet before starting.
Lead-safe practices
Contain the work area, minimize dust, avoid prohibited practices like open-flame burning and clean thoroughly.
Cleaning verification
Verify cleaning at the end of the job following the required procedure.
Records
Keep records of training, notices and work practices for the required period.
State programs
Some states run their own programs with additional rules.
Penalties
Fines for violations can be very high. Compliance costs far less.
Common mistakes
Working on older homes without certification, skipping the pamphlet and poor containment.
Getting started
If you work on homes or child-occupied facilities built before 1978, check your firm certification and make sure at least one person on every crew is a certified renovator. Keep the lead pamphlet and a containment kit in every truck.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
Which jobs fall under the RRP rule?
Renovation, repair and painting work that disturbs painted surfaces in homes and child-occupied facilities built before 1978, above the minimum area thresholds set by the EPA, generally requires certified firms and renovators.