Safety

Asbestos survey before renovation and demolition

By Scavi Company · · 3 min read
Asbestos survey before renovation and demolition

A survey before work starts protects workers, occupants and your company.

Asbestos is still in older buildings

Many buildings constructed before the 1980s contain asbestos in flooring, insulation, roofing, drywall compound and other materials. Disturbing it during renovation or demolition can release fibers that cause serious disease. A survey before work starts protects workers, occupants and your company.

Regulations

EPA's asbestos NESHAP rules generally require an inspection before renovation or demolition of many buildings, and OSHA has rules for worker exposure. States and cities often add their own requirements.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Who does the survey

Surveys are done by accredited asbestos inspectors who take samples and send them to a lab.

When to survey

Before demolition, gut renovations and any work that disturbs suspect materials in older buildings.

Read the report

The report lists materials that contain asbestos and their location. Plan the work around it.

Abatement first

If asbestos will be disturbed, a licensed abatement contractor removes it before your work.

Schedule and budget

Surveys and abatement take time and money. Include them in the plan from the start.

Contract language

Define who pays for surveys and abatement, and what happens if hidden asbestos is found.

Stop if you find suspect material

If crews uncover material not in the report, stop and test.

Keep records

Keep survey reports and abatement documents with project records.

Common mistakes

Assuming a building is too new, skipping the survey on small jobs and letting crews demo first and ask later.

An example

Before a tenant improvement in a 1970s office, the GC orders a survey. Old floor tile and mastic test positive. Abatement is scheduled first, the schedule absorbs one week, and the owner is informed before the contract is signed.

Where to start

Add an asbestos question to your pre-bid checklist for every building older than about 1980: has a survey been done, and where is the report? Asking before you price protects the schedule and the budget.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Is an asbestos survey required before demolition?

EPA rules generally require an inspection before renovation or demolition of many buildings, and state and local rules often add requirements.