Connected sites run software, cameras and communication smoothly.
In this article
Options
Cellular and satellite.
Coverage
Trailer and floors.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Cameras
Remote.
Software
Field use.
Security
Passwords.
A closer look
Field teams lose time walking back to the trailer to upload photos or check drawings. Good coverage pays for itself.
Where to start
Plan connectivity during mobilization.
An example
A GC installed mesh Wi-Fi on each floor. Field teams used tablets everywhere.
Common mistakes
No plan, weak coverage and open networks.
What to track
Track uptime and field usage.
Questions to ask
What options exist? Where is coverage needed? Who manages security?
Who owns it
Superintendent with IT support.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
How do contractors get internet on jobsites?
Through cellular hotspots, temporary broadband, satellite options or extending the owner's network when allowed.