Fire alarm acceptance testing

By Scavi Company · · 3 min read
Fire alarm acceptance testing

Fire alarm acceptance is often on the critical path to occupancy.

Devices

All installed.

Programming

Complete.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Integrations

Elevators and doors.

Pretests

Before the marshal.

Documentation

Reports.

A closer look

Fire alarm tests involve doors, elevators, HVAC shutdowns and sprinklers. If any integration fails, the test is repeated and occupancy slips. A full pretest saves the date.

Where to start

Schedule a full pretest with all integrated trades.

An example

A GC ran a pretest and found an elevator recall issue. Fixing it before the marshal visit saved the occupancy date.

Common mistakes

No pretest, missing integrations and late scheduling.

What to track

Track pretest issues and test dates.

Questions to ask

Are all integrations ready? Who attends? When is the marshal available?

Who owns it

The fire alarm contractor programs and tests the system, but the GC owns coordination of every integrated trade and the scheduling with the authority having jurisdiction.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What is a fire alarm acceptance test?

A test witnessed by the fire marshal or authority to verify that the fire alarm system and its integrations work as designed before occupancy.