Compliance

EPA RRP rule: lead-safe work practices for renovation

By Scavi Company · · 3 min read
EPA RRP rule: lead-safe work practices for renovation

Renovating homes built before 1978 triggers federal lead rules. Here is what contractors need to know.

Why the RRP rule matters

Many homes built before 1978 have lead-based paint. Renovation that disturbs it creates dust that is dangerous, especially for children. The EPA Renovation, Repair and Painting rule sets requirements for contractors working in these buildings.

When it applies

Work that disturbs painted surfaces in pre-1978 homes, child care facilities and schools, above certain minimum areas. Some states run their own programs.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Firm certification

The company must be certified by EPA or the authorized state program.

Certified renovator

A certified renovator must be assigned to each job, train workers and oversee lead-safe practices.

Pre-renovation education

Give owners and occupants the required lead pamphlet before work starts and keep proof.

Containment

Plastic sheeting, sealed doors and controlled work areas keep dust inside.

Prohibited practices

Certain methods, like open-flame burning and high-speed sanding without controls, are prohibited.

Cleaning and verification

Specific cleaning steps and verification are required after work.

Documentation

Keep records of certification, training, containment and cleaning.

Penalties

Violations can bring significant fines. Compliance is cheaper.

Common mistakes

Assuming small jobs don't count, skipping the pamphlet and failing to document.

Where to start

Check your firm certification, schedule renovator training and add an RRP checklist to every pre-1978 job.

Talk to the customer

Explain why you set up plastic and clean so carefully. Customers who understand lead-safe practices see the extra cost as care for their family, not as padding the bill.

Price it in

Containment and cleaning take time and materials. Include them as a clear line in estimates for pre-1978 homes.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Who needs RRP certification?

Firms that perform renovation, repair or painting work that disturbs painted surfaces in pre-1978 homes, child care facilities and schools generally need EPA firm certification and a certified renovator, unless an exemption applies or a state program covers it.