How a site is left at night affects theft, vandalism and the safety of anyone who enters after hours.
In this article
Secure tools
Locked boxes and containers.
Close the site
Gates, doors and fences.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Equipment
Keys removed and machines parked safely.
Hazards covered
Holes and openings protected.
Final walk
Check that everyone has left.
Common mistakes
Keys left in equipment, open gates and uncovered holes.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
What should an end-of-day lockup include?
Securing tools and materials, closing gates and openings, shutting off equipment, covering holes and checking that no one is left on site.