EV charging projects are growing in parking lots and garages.
In this article
Capacity
Power.
Site
Layout.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Trenching
Conduits.
Utility
Upgrades.
Accessibility
Spaces.
A closer look
Owners see chargers; contractors see transformers, trenches and utility timelines. Early load analysis prevents surprises.
Where to start
Request a load analysis before pricing.
An example
A GC identified a transformer upgrade early. The owner adjusted budget and schedule.
Common mistakes
Ignoring capacity, poor layout and late utility applications.
What to track
Track utility approvals.
Questions to ask
What capacity exists? How many chargers? What upgrades?
Who owns it
PM coordinates electrical engineer and utility.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
What is the biggest challenge in commercial EV charging projects?
Often electrical capacity and utility upgrades, which can drive cost and schedule.