Calling 811 before you dig

By Scavi Company · · 3 min read
Calling 811 before you dig

Every excavation starts with a locate request. Skipping it puts crews and neighborhoods at risk. Here is how to make 811 part of every dig.

When to call

Before any digging, from small post holes to major excavation.

Marking colors

Red for electric, yellow for gas, orange for communications, blue for water, green for sewer.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Waiting period

Each state sets a waiting period. Do not dig early.

Tolerance zone

Hand dig or use careful methods within the tolerance zone around the marks.

Private lines

811 usually marks public utilities only. Private lines may need a private locator.

Documentation

Save the ticket number and photograph the marks before digging.

Re-marks

If marks fade or the job runs long, request a re-mark.

Getting started

Make the 811 ticket number a required field on every dig checklist.

Common mistakes

Digging before the wait ends, ignoring private lines and no photos of the marks.

Example

A landscaping contractor required photos of every locate mark before digging. When a damaged line was reported, the photos showed the line was unmarked, protecting the company from the claim.

Before the crew digs

Ticket number written on the work order, marks photographed, private lines located and tolerance zone explained to the operator.

What to track

Digs with a valid ticket, re-mark requests and any utility strikes.

Talking with the crew

Make 811 a hard stop: no ticket, no digging. Clear rules prevent shortcuts on busy days.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

How long do you wait after calling 811?

The waiting period depends on the state, often a few business days. Do not dig until the locate period has passed and utilities are marked or have responded.