Regular movers avoid slate pool tables. Specialists who disassemble, move and level them charge well and get referrals from movers and dealers.
In this article
Why it is a niche
Slate tables can weigh hundreds of pounds and need disassembly and releveling. Most movers refer these jobs out.
Disassembly
Rails, pockets, felt and slate come apart in order. Label every part.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Transport
Slate pieces travel padded and upright.
Leveling
A perfectly level table is what the customer judges. Take your time.
Felt replacement
Many customers change the felt during a move. Offer it.
Stairs and basements
Price stairs and tight spaces as add-ons.
Partners
Moving companies, billiard dealers and game room designers.
Getting started
Contact local moving companies and offer to handle their pool table jobs.
Common mistakes
Moving slate assembled, losing small parts and skipping leveling.
Example
A two-person team that moved pianos added pool tables. Three moving companies started sending every table job their way, and felt replacement doubled the average ticket.
What to ask before quoting
Table brand and size, slate or not, pickup and drop-off addresses, stairs at both ends and whether the customer wants new felt. A photo of the table and the path out of the room helps a lot.
Seasonal work
Moving season in summer and game room projects in fall bring most of the jobs. Partner with movers before the busy months.
Pricing tips
Charge a base price for disassembly, transport and leveling. Add stairs, long carries and felt as separate lines so the customer sees exactly what they pay for.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
Can a pool table be moved without taking it apart?
Small non-slate tables sometimes can, but slate tables should be disassembled. Moving them assembled can crack the slate and damage the frame.