In cold regions, ice dams can push water under shingles and into homes. Heat cables are a common solution, and contractors who install them before winter keep a busy fall schedule.
In this article
The problem homeowners have
Icicles, ice dams and water stains on ceilings. Last winter's damage brings this winter's call.
Timing
Market in late summer and fall. Installing on an icy roof is slower and riskier.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Inspection first
Check the roof edge, gutters and downspouts. Sometimes insulation or ventilation is part of the fix.
Safe installation
Use the manufacturer's clips and layout. A neat zigzag pattern also looks better from the street.
Electrical
Plan the outlet and circuit. Partner with a licensed electrician when needed.
Pricing
Quote by linear foot of roof edge and gutter, plus electrical work.
Seasonal follow-up
Offer a fall check each year. It turns one install into a recurring visit.
Common mistakes
Installing too late, ignoring downspouts and no advice on when to turn the cables on.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
When is the best time to install heat cables?
Fall, before the first snow. Roofs are easier and safer to work on, and homeowners who had ice dams last winter are already thinking about it.