Fleet

Outfitting a new service van

By Scavi Company · · 3 min read
Outfitting a new service van

A new van is a big investment. Here is how to set it up for efficient, safe service calls.

Why the setup matters

Techs spend hours a week looking for parts and tools in disorganized trucks. A well-planned van saves time on every call, reduces return trips and keeps the team safe.

Standard layout

Use the same layout in every van of the same trade.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Shelving and bins

Labeled bins and shelving keep parts visible and secure.

Stock by real calls

Stock the parts used most in the last year, not everything.

Ladders and racks

Secure ladder racks and roof storage protect both tools and drivers.

Power

Inverters or power systems for tools and charging.

Safety

Secure everything. Loose items become projectiles in a crash.

Weight

Stay within payload limits for safety and fuel efficiency.

Branding

Wraps with clear service lines and phone numbers turn the van into marketing.

Where to start

Ask your best tech to design the ideal layout, test it in one van and adjust before outfitting the fleet.

Know your numbers

Track upfit cost per van and return trips caused by missing parts.

Common mistakes

Overloading, unsecured gear and every van set up differently.

An example

An electrical contractor let its best tech design the shelving of one new van. After a month of adjustments, the layout became the standard for the fleet, and new techs found parts faster on their first week.

Price every call so it pays.

We help service businesses set clear policies, book better jobs and turn more calls into profitable work.

Frequently asked questions

Should every service van have the same layout?

A standard layout by trade makes it easier for techs to find parts in any truck, simplifies restocking and speeds training.