Operations

Cold weather safety for technicians

By Scavi Company · · 3 min read
Cold weather safety for technicians

No-heat calls, frozen pipes and storm damage keep crews busy all winter. A short cold weather routine keeps technicians safe and the schedule on track.

Layers and gear

Base layer, warm middle layer and a waterproof shell. Insulated gloves for walking, thinner gloves for detailed work.

Attics and crawlspaces

Cold attics and wet crawlspaces drain body heat fast. Limit the time inside and bring a pad to kneel or lie on.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Warm-up breaks

Plan short breaks in the truck on long outdoor jobs. Warm drinks help; skipping lunch doesn't.

Ice on driveways and roofs

Wear ice cleats, salt the path to the truck and skip roof work when it is icy. Reschedule rather than risk a fall.

Know the signs

Shivering, numb fingers, pale skin and confusion are signs to stop and warm up. Teach every tech to spot them in a coworker.

Buddy checks

Technicians working alone check in with the office at set times on the coldest days.

Common mistakes

Wet gloves all day, rushing on ice to keep the schedule and sending techs alone into long outdoor jobs.

Price every call so it pays.

We help service businesses set clear policies, book better jobs and turn more calls into profitable work.

Frequently asked questions

What gear should a company provide for winter work?

Insulated gloves that still allow fine work, ice cleats for boots, hand warmers and a spare dry layer in the truck. Waterproof outer layers matter more than thick ones.