Writing subcontractor scopes of work

By Scavi Company · · 3 min read
Writing subcontractor scopes of work

Clear scopes prevent the gaps that become change orders.

Inclusions

Specific.

Exclusions

Clear.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Interfaces

Between trades.

Schedule

Milestones.

Cleanup

Daily.

A closer look

Gaps often appear between trades: who does blocking, firestopping, patching? A scope matrix assigning every item to one trade prevents arguments.

Where to start

Create a scope matrix for common gap items.

An example

A GC used a scope matrix on a school project. Gap disputes dropped sharply.

Common mistakes

Copying old scopes, vague language and missing interfaces.

What to track

Track scope-related change orders.

Questions to ask

Who owns each gap item? Are exclusions reviewed? Is cleanup defined?

Who owns it

Estimators draft scopes at buyout, and project managers confirm them against drawings and specifications before subcontracts are issued. Superintendents should review interfaces.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What should a subcontractor scope include?

Specific inclusions, exclusions, interfaces with other trades, schedule requirements, cleanup, safety, submittals and closeout responsibilities.