Environmental

Track-out and mud control

By Scavi Company · · 3 min read
Track-out and mud control

Trucks leaving the site carry mud into public streets. It angers neighbors, creates slip hazards and often violates stormwater permits.

Construction entrance

Limit exits to one or two stabilized entrances. Every extra exit is another source of mud.

Stabilized exits

Stone over fabric, sized to the traffic, knocks mud off tires before the street.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Refresh the stone

When the stone fills with mud, it stops working. Add or replace it as needed.

Wheel washing

On muddy sites, a wheel wash station may be needed. Plan where the water goes.

Street sweeping

Sweep the street at the end of the day or more often in wet weather.

Inspections

Check track-out daily and after rain, and record what was done.

Neighbors

Clean streets protect the relationship with neighbors and with the city.

Common mistakes

Too many exits, stone never refreshed and washing mud into storm drains.

Plan before the rain

Check entrances and sweeping supplies before forecasted storms, not after the street is covered in mud.

Assign responsibility

One person owns track-out control each day. Shared jobs are skipped jobs.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What is a stabilized construction entrance?

A section of the site exit built to knock mud off tires before vehicles reach the street, often made with stone over fabric. Follow the design in your stormwater plan.