Steel shop drawings and detailing

By Scavi Company · · 3 min read
Steel shop drawings and detailing

Errors in steel drawings become errors in fabricated steel.

Detailing

Fabricator's drawings.

Review

GC and engineer.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

RFIs

Resolve questions.

Connections

Design responsibility.

Coordination

Openings and embeds.

A closer look

Steel shop drawings must show openings for ducts, embed plates for other trades and connections designed per the contract. A rushed review leads to field cutting and welding that costs time and money.

Where to start

Review steel shop drawings with MEP and architectural trades.

An example

A GC found missing duct openings in steel beams during review. Fabrication was corrected before shipping.

Common mistakes

Rubber-stamping reviews, ignoring other trades and late approvals.

What to track

Track review time and field fixes.

Questions to ask

Who reviews for coordination? Are openings shown? Is the schedule realistic?

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Who reviews steel shop drawings?

Typically the GC for coordination and the engineer of record for design conformance, according to the contract.