Winter work doesn't stop at the first storm, but it does change. The jobs that keep moving are the ones that decided before the snow who clears what and how fast.
In this article
Decide who clears it
Put it in the contract or the site plan: GC, owner or a snow contractor. Include the trigger, like two inches.
Access first
Clear the entrance, the road for deliveries and the parking area before the crew arrives.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Walkways and stairs
Shovel and salt every path people walk on. Slips on ice are one of the most common winter injuries.
Roofs, decks and scaffolds
Clear snow before anyone goes up, and check the load on flat roofs and temporary structures.
Protect materials
Cover lumber, drywall and insulation. Keep pallets off the ground.
Salt and sand
Keep a supply on site. Avoid salt on fresh concrete.
Document delays
Photos, dates and snowfall amounts. You'll need them for any time extension.
Common mistakes
No one assigned, crews walking on icy scaffolds and materials buried under snow for days.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
Who is responsible for snow removal on a construction site?
It depends on the contract. Often the general contractor clears access, walkways and work areas, and the owner handles public sidewalks. Write it down before winter so nobody argues after the first storm.