Skid steers are on almost every site, and rollovers and crush injuries are real risks.
In this article
Trained operators
Only qualified people.
Seat belt and bar
Always in place.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Loads low
Carry loads low on slopes.
Lower arms before exiting
Never leave with arms raised.
Watch the area
People stay clear of the machine.
Common mistakes
Riders in the bucket, exiting with raised arms and operating on steep slopes.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
What is the biggest skid steer hazard?
Rollovers and crush injuries, especially when operators exit with the arms raised or carry loads too high on slopes.