Pre-pour checklist for concrete

By Scavi Company · · 3 min read
Pre-pour checklist for concrete

Fixing a form before the pour takes minutes. Fixing it after takes a saw, a jackhammer and a hard conversation with the client. A short checklist the day before saves all of that.

Forms and grades

Check dimensions, level, slope and bracing. A form that moves under the weight of the concrete is the most expensive mistake on the list.

Rebar and cover

Spacing, laps, chairs and the right cover from the form and the ground. Walk on it: rebar should not move.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Embeds and sleeves

Anchor bolts, plumbing and electrical sleeves, hold-downs and blockouts in the right place. Compare with the drawings, not with memory.

Inspections

Confirm the inspection is passed and written down before ordering the trucks.

Weather

Check rain, heat and freezing for the pour and the next days. Have blankets, covers or retarder ready when needed.

Access, crew and tools

Truck and pump access, washout area, enough people, vibrator, screeds and backup tools on site.

Common mistakes

Ordering trucks before the inspection, no backup vibrator and finding a missing sleeve with the concrete already in the forms.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Who should sign off on the pre-pour checklist?

The foreman walks it, and the project manager or superintendent signs it. When an inspector is required, the pour is not scheduled until the inspection is passed and recorded.