Methods

Mass timber construction basics for contractors

By Scavi Company · · 3 min read
Mass timber construction basics for contractors

Mass timber is growing in mid-rise construction. Here is what builders need to understand.

What it is

Mass timber uses engineered wood panels and beams for structure. It is used in offices, schools and mid-rise housing. Panels arrive prefabricated, which speeds construction.

CLT and glulam

Cross-laminated timber panels and glued laminated beams are the main products.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Benefits

Faster erection, lighter structure and appeal to sustainable projects.

Codes

Building codes have expanded allowances. Confirm local adoption.

Moisture protection

Protect timber from rain during construction.

Crane and sequencing

Precise lifting plans keep erection fast.

Coordination

MEP penetrations must be planned early.

Costs

Compare total schedule savings, not just material price.

Where to start

Partner with an experienced timber installer on your first project.

An example

A builder used CLT floors on a four-story office and finished structure weeks faster than planned with careful crane sequencing.

Know your numbers

Erection days, crane hours and moisture readings.

Common mistakes

Late MEP coordination, poor moisture protection and underestimating crane planning.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What is mass timber?

It refers to engineered wood products like cross-laminated timber and glulam used for structural floors, walls and beams in larger buildings.