Healthcare construction requires strict infection control. Here is what contractors need to know.
In this article
Why it matters
Hospitals and clinics have vulnerable patients. Construction dust can spread infections. Facilities require contractors to follow strict infection control procedures.
ICRA
The assessment defines the precautions for each project.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Containment
Barriers and sealed openings separate work from patient areas.
Negative air
Air flows into the work area, not out.
Dust control
HEPA vacuums, sticky mats and covered debris.
Inspections
Facility staff inspect barriers regularly.
Communication
Coordinate with infection control and facility managers.
Training
Train crews before they enter.
Where to start
Get your supervisors trained in healthcare construction practices before bidding hospital work.
An example
A GC renovating an outpatient clinic used negative air and daily barrier checks. The facility passed every infection control inspection during the project.
Know your numbers
Track barrier inspections, deficiencies and corrections.
Common mistakes
Gaps in barriers, uncovered debris and poor communication with facility staff.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
What is ICRA in construction?
An Infection Control Risk Assessment determines the level of precautions needed for construction in healthcare facilities, based on the type of work and the patient risk in the area.