Angle grinders spin at high speed and can shatter wheels or kick back. Respecting the tool prevents serious injuries.
In this article
Right wheel
Rated for the grinder speed.
Guard on
Positioned between you and the wheel.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Two hands
Use the side handle.
Face and eye protection
Face shield over safety glasses.
Sparks
Keep away from flammables.
Common mistakes
Removing guards, using cut-off wheels for grinding and side loading thin wheels.
Run tighter jobs and win the right ones.
We help construction companies build the systems, online presence and client relationships that bring better projects.
Frequently asked questions
Why do grinder wheels break?
Wrong wheel type, exceeding the speed rating, damage or missing guards. Always match the wheel to the tool and inspect it.