Safety

Floor holes and opening covers on the jobsite

By Scavi Company · · 3 min read
Floor holes and opening covers on the jobsite

Falls through floor holes and skylights are preventable. Here is how to cover and manage openings.

Why openings are dangerous

Floor holes, shafts, stairwell openings and skylights are everywhere during construction. Workers carrying material often can't see where they step. Falls through openings are serious and often fatal.

OSHA cover requirements

OSHA requires covers strong enough to support at least twice the weight that may be placed on them, secured against moving, and marked with the word "HOLE" or "COVER." Know the details in the standard.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Secure the cover

Screw or cleat covers so they can't slide or be kicked aside. A loose sheet of plywood is not a cover.

Mark clearly

Bright paint and the word HOLE or COVER warn everyone. Markings must stay visible.

Guardrails for larger openings

Large openings and floor edges need guardrails. Plan them before work begins.

Skylights

Skylights are not designed to hold a person. Cover or guard them.

Communication between trades

When one trade removes a cover to work, they must replace it. Make it a site rule.

Daily inspection

The superintendent checks covers on the morning walk.

Training

Teach crews never to remove or step on unknown covers.

Toolbox talk

"If you lift a cover, you put it back and secure it. If you see one missing, stop and report it."

Common mistakes

Unsecured plywood, faded markings and covers removed and not replaced.

Where to start

Walk the site today, list every opening and assign responsibility for each cover.

Who owns each opening

Assign every opening to a trade or to the GC's labor crew. When ownership is clear, covers get replaced. When everyone is responsible, nobody is.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What does OSHA require for hole covers in construction?

OSHA requires covers to support at least twice the weight of employees, equipment and materials that may be imposed, be secured against displacement and be marked with the word HOLE or COVER.