Document control on construction projects

By Scavi Company · · 3 min read
Document control on construction projects

Document control makes sure everyone builds from the latest information.

Current set

One source of truth.

Revisions

Logged and distributed.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Field access

Tablets or printed sets.

RFIs and submittals

Linked to drawings.

Archiving

Old versions marked.

A closer look

Rework often starts with someone building from an outdated sheet. A clear process for receiving, logging and distributing revisions, plus removing old sheets from the field, prevents those mistakes.

Where to start

Assign one person responsible for drawing revisions on each project.

An example

A GC moved its field team to tablets with automatic updates. Rework from outdated drawings dropped.

Common mistakes

Multiple versions in the field, no log and unclear responsibility.

What to track

Track revisions issued, distribution time and rework caused by outdated documents.

Questions to ask

Who receives and logs revisions? How quickly do changes reach the field? Are old sheets removed from the trailer? Can a foreman find the latest RFI answer in minutes?

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What is document control in construction?

The process of managing drawings, specifications, revisions, RFIs and submittals so the field always has the current information.