Contracts

Design errors and omissions: who pays?

By Scavi Company · · 3 min read
Design errors and omissions: who pays?

Missing details and conflicts in drawings are common. Handled poorly, they eat your margin.

Why it matters

No set of drawings is perfect. Conflicts between disciplines, missing dimensions and details that can't be built show up on every job. Contractors who spot them early and follow the contract get paid. Those who quietly fix them absorb the cost.

Spot them early

Constructability reviews and careful takeoff reveal problems before the field does.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

RFIs

Submit clear RFIs with proposed solutions.

Notice

Follow contract notice requirements for cost and time.

Change orders

Price the impact of the answer.

Contract language

Read how design risk is allocated.

Design-build

When you hold the design contract, the risk shifts to you and your designers.

Documentation

Photos, RFIs and correspondence tied to costs.

Know your numbers

Track RFIs, change orders from design issues and unrecovered costs.

A message to the architect

"Detail 5 on A-501 conflicts with the duct shown on M-201. We propose lowering the ceiling two inches in this corridor. Please confirm, as it affects cost and schedule."

Where to start

Add a design review step before buyout on every project.

Common mistakes

Fixing errors without notice, vague RFIs and missing contract deadlines.

Relationship with the designer

Raise issues professionally and early. Architects respond better to a contractor who brings solutions than to one who builds a claim file in silence.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Who pays for design errors in a construction project?

It depends on the contract and delivery method. In traditional design-bid-build, the owner usually bears design risk; in design-build, the contractor may carry more of it.