Methods

Cold-formed steel framing

By Scavi Company · · 3 min read
Cold-formed steel framing

Cold-formed steel framing is common in commercial and multifamily buildings.

Uses

Walls and soffits.

Design

Delegated design often.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Connections

Engineered details.

Coordination

MEP penetrations.

Fire ratings

Tested assemblies.

A closer look

Many cold-formed steel systems use delegated design, meaning the framing subcontractor's engineer designs parts of the system. Coordinating these submittals early with structure, envelope and MEP avoids field conflicts.

Where to start

Confirm which framing elements require delegated design and schedule those submittals early.

An example

A GC coordinated steel stud submittals with mechanical drawings. Penetrations were planned and field cutting was minimized.

Common mistakes

Late delegated design, unplanned penetrations and wrong gauge.

What to track

Track submittal approvals, field changes and inspections.

Questions to ask

Which elements require delegated design? Are penetrations coordinated with MEP? Do assemblies match the tested fire-rated designs? Who reviews connection details?

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Where is cold-formed steel used?

Interior partitions, exterior walls, soffits, trusses and some load-bearing structures in commercial and multifamily construction.