Safety

Avoiding underground utility strikes

By Scavi Company · · 3 min read
Avoiding underground utility strikes

Hitting gas, power or fiber lines is costly and dangerous. Here is how to prevent it.

Why strikes happen

Utilities are often mismarked, unmarked or deeper or shallower than expected. Operators dig too close to marks. One strike can cause injuries, outages and big costs.

Call 811

Submit locate requests before digging.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Wait for marks

Don't dig until utilities are marked.

Tolerance zones

Hand dig or use vacuum excavation near marks.

Private lines

811 doesn't locate private utilities. Hire a private locator.

Potholing

Expose utilities before heavy digging nearby.

Document

Photos of marks and tickets protect you.

Training

Train operators and laborers on marks and colors.

Response plan

Know what to do if a line is hit.

An example

A site contractor added private locates to every commercial job and found an unmarked electrical line before excavation.

Know your numbers

Track locate tickets, strikes and near misses.

Common mistakes

Digging before marks, ignoring private lines and no photos.

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

What should contractors do before digging?

Call 811 or submit a locate request, wait for marks, respect tolerance zones, locate private lines and verify utilities by careful hand digging or vacuum excavation.