Safety

Aerial lift and scissor lift safety on the jobsite

By Scavi Company · · 3 min read
Aerial lift and scissor lift safety on the jobsite

Scissor and boom lifts are on almost every commercial job. Here is how to keep the work fast and safe.

Aerial lifts make work at height easier, and riskier

Scissor lifts and boom lifts are on almost every commercial jobsite. They reduce the need for ladders and scaffolding, but tip-overs, falls, electrocutions and caught-between injuries still happen. A clear aerial lift plan keeps the work fast and safe.

Operator training

Workers must be trained on the specific type of lift before using it, including hazards, controls and the manufacturer's manual. Keep training records.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Pre-use inspection

Check controls, emergency lowering, guardrails, tires, alarms and fluid leaks before every shift. A damaged lift should be tagged out until repaired.

Fall protection

On boom lifts, workers should wear a harness and lanyard attached to the designated anchor point. On scissor lifts, guardrails are the primary protection, and the manufacturer's instructions on harness use apply.

Check the surface

Holes, drop-offs, slopes and soft ground cause tip-overs. Walk the path before moving the lift.

Watch the wind

Each lift has a maximum wind speed for operation. Check the forecast and stop work when limits are exceeded.

Avoid caught-between hazards

Workers can be crushed between the platform and overhead structures. Move slowly near beams and ceilings.

Power line clearance

Keep the required distance from overhead power lines. Plan the work before raising the platform.

Rescue plan

If a worker is stuck or suspended in a harness, rescue must be fast. Know how to use ground controls.

Never overload or misuse

No climbing on guardrails, no ladders on the platform and no exceeding rated capacity.

Rented lifts

Most lifts on site are rented. Inspect on delivery, confirm the manual is on board and report problems to the rental company right away. Make sure workers are familiarized with that specific model, since controls differ between brands.

The ground crew

Someone on the ground should know how to lower the platform in an emergency and keep the area below clear of people and traffic.

A toolbox talk example

"Boom lift today. Harness on and clipped before you leave the ground. Check the path for holes, and if the wind picks up, bring it down."

Run tighter jobs and win the right ones.

We help construction companies build the systems, online presence and client relationships that bring better projects.

Frequently asked questions

Do you need a harness in a scissor lift?

On scissor lifts, guardrails are the primary fall protection, and the manufacturer's instructions apply. On boom lifts, workers should wear a harness and lanyard attached to the designated anchor.