Drafty doors and windows waste energy and comfort. Sealing them is a quick win for homeowners.
In this article
Find leaks
Visual and smoke tests.
Doors
New weatherstripping.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Windows
Sealing gaps.
Attic hatch
Often forgotten.
Results
Comfort improvement.
Common mistakes
Wrong materials, blocked ventilation and missed areas.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
Where do most drafts come from?
Doors, windows, attic hatches, outlets on exterior walls and gaps around pipes.