Wallpaper is back in demand. Here is how installers build a steady stream of jobs.
In this article
Why wallpaper is a good niche
Wallpaper came back in powder rooms, accent walls, nurseries and offices. Many painters avoid it, and homeowners struggle to find skilled installers. That makes good installers busy and well paid.
Who buys
Homeowners, interior designers, restaurants, boutique hotels and offices.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Accent walls first
Most homeowners start with one wall or a powder room. Those small jobs lead to bigger ones.
Prep decides the result
Smooth, primed walls make seams disappear. Explain the prep in the quote.
Measuring and pattern match
Patterns need extra material. Help customers order the right amount.
Removal
Removing old wallpaper is slow work. Price it separately.
Designers
Interior designers specify wallpaper and need reliable installers. Build those relationships.
Commercial work
Restaurants and hotels use commercial wallcoverings. It is a different skill set and a bigger ticket.
Photos
Close-ups of seams and full-room shots prove quality.
A message that books
"Hi Amanda, send me a photo of the wall and the wallpaper you picked. I'll tell you how many rolls to order and give you a price today."
Common mistakes
Hanging over poorly prepared walls, mismatched patterns and visible seams.
Know your numbers
Track jobs, rolls per day and designer referrals. Designers often become your main source of work.
How to get started
Install wallpaper in a powder room or accent wall for a friend or your own home and photograph it well. Then introduce yourself to local designers and wallpaper showrooms with that portfolio and a simple price sheet.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
How do wallpaper installers usually charge?
Many charge by roll or by wall, with separate pricing for removal of old wallpaper and wall preparation.