Solar screens block heat and glare from sunny windows. In hot climates, they are an easy upgrade homeowners understand.
In this article
Where they work
West and south windows in hot climates. Ask which rooms feel hottest.
Fabric choices
Different openness levels balance view and heat control.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Measuring
Custom sizes for each window.
Bundle
Window cleaning and screen repair in the same visit.
Seasonal timing
Market before summer.
Common mistakes
Wrong sizes, poor frame fit and promising exact savings.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
Do solar screens lower energy bills?
They can reduce heat gain through windows, which helps the air conditioner. Results depend on the home, window orientation and climate.