Rotten fascia and damaged soffits let water and animals into the home. These repairs often come up during gutter and roof work.
In this article
How customers find the problem
Sagging gutters, peeling paint and animals in the attic.
Materials
Wood, aluminum wrap or composite. Explain durability and price.
Keep reading — free
The rest of this article is worth the 20 seconds
Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.
Rather just talk? Message us on WhatsApp.
Fix the cause
Check gutters and drip edge.
Ventilation
Vented soffits help attic airflow.
Partners
Gutter and roofing companies find these problems weekly.
Common mistakes
Covering rot with aluminum, ignoring ventilation and mismatched colors.
Turn your work into your best advertising.
We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.
Frequently asked questions
What causes fascia to rot?
Overflowing gutters, missing drip edge and old paint let water soak into the wood. Fixing the cause prevents the repair from failing again.