Lead generation

Skylight installation leads

By Scavi Company · · 3 min read
Skylight installation leads

Skylights bring light into dark rooms. Here is how to sell them without callbacks.

Why skylights sell

Dark hallways, bathrooms and kitchens benefit from natural light. Skylights and sun tunnels brighten rooms and add value.

Types

Fixed, venting and sun tunnels.

Keep reading — free

The rest of this article is worth the 20 seconds

Tell us where to send it and the full piece unlocks right here, along with everything else on this blog.

Rather just talk? Message us on WhatsApp.

Leaks

Proper flashing prevents leaks.

Sun tunnels

Lower-cost option for small spaces.

Roof replacement timing

Best moment to add or replace skylights.

Permits

Check local requirements.

Energy

Efficient glass reduces heat gain.

Pricing

By type and roof complexity.

Where to start

Offer skylight replacement with every roof replacement estimate.

A message that books

"Hi Amy, since we're replacing your roof, it's the best time to replace the old skylight too. I'll add the option to the estimate."

Common mistakes

Poor flashing, ignoring old skylights during reroofs and wrong placement.

An example

A roofer began including skylight replacement as an option in every reroof estimate. A good share of customers with old skylights accepted, and leak callbacks dropped because flashing was installed with the new roof.

Know your numbers

Track skylights sold per roof job and leak callbacks over the following year.

Turn your work into your best advertising.

We help home service contractors turn real projects, videos and events into a steady flow of local leads and booked estimates.

Frequently asked questions

When is the best time to replace a skylight?

Often during roof replacement, when flashing and roofing materials can be installed together.